Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 15, 2019, 06:10 AM
  • 22 0263_22 0262 _01142019_222449.mp4

Date
01/14/2019
W/O
745520
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16545
Time
10:10 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6304
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_745520_TV22016_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0263
Downstream MH
22 0262
Dir. of Survey
Downstream
Length Surveyed
250.9 ft.
Total Length
250.9 ft.
Structural Index
2
Structural Quick
322I
Structural Rating
104
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
108
Pipe schematic from manhole 22 0263 to 22 0262
MH: 22 0263MH: 22 0262downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02630 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"111.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"159.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"208 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"249 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish249 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish249 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0262250.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0AMH22 0263
2DAGS
11.8TFC
156.9TFC
2SSS
0MWM
2SAP
250.9AMH22 0262
250.9MGOACTIVE CONNECTION AT MH 9 O'CLOCK
208TFC
54.2TFA
249DAGS
0MWL
249SAP
159.8TFC
111.3TFC
249SSS

Properties (6)

additional_info
SC365670
custom_field_two
2
customer
LACSD
datetime
2019-01-14T22:10:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false