Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2019, 10:52 AM
  • 22 0265_22 0264_01142019_031901.mp4

Date
01/14/2019
W/O
745520
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16548
Time
2:52 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6303
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_745520_TV22016_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0265
Downstream MH
22 0264
Dir. of Survey
Downstream
Length Surveyed
439 ft.
Total Length
439 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
435
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
441
Pipe schematic from manhole 22 0265 to 22 0264
MH: 22 0265MH: 22 0264downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02650 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"49.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"57.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"106.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"110 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"140 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"142.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"159.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"207.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"215.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"249.2 ft. TBI - Tap Break-In Intruding, at 09 o'clock, -, #v, within 8 inches of joint: YES, 6", 1"259.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"308.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"316.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"361 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"380.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"409.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"436.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish436.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish436.3 ft. MMC - Material Change, Vitrified clay pipe437.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish439 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK439 ft. AMH - Downstream Manhole, Survey Ends - 22 0264439 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (6)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    0 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 09 o'clock, -, #v, within 8 inches of joint: YES, 6", 1"

    249.2 ft. - Tap Break-In Intruding, at 09 o'clock, -, #v, within 8 inches of joint: YES, 6", 1"

  • Material Change, Vitrified clay pipe

    436.3 ft. - Material Change, Vitrified clay pipe

  • General Observation - COCKROACHES IN MANHOLE

    439 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (30)

DistanceCodeObservation
361TF
0MWM
207.3TFC
409.1TFC
308.5TFC
215.9TFC
57.8TFC
380.8TFC
0AMH22 0265
106.3TFC
259.8TFC
142.6TFC
9.4TFA
159.1TFC
0SAP
439MGOACTIVE CONNECTION AT MH 9 O'CLOCK
436.3SAP
437.2DAGS
110TFA
49.6TFC
140TBA
436.3SSS
0MWL
2DAGS
2SSS
249.2TBI
436.3MMC
439AMH22 0264
316.3TFA
439MGOCOCKROACHES IN MANHOLE

Properties (6)

additional_info
SC365669
custom_field_two
2
customer
LACSD
datetime
2019-01-14T02:52:43-08:00
documentation
PRO PIPE
is_lateral_inspection
false