Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 17, 2019, 09:16 AM
  • 22 0270_22 0269_01172019_012406.mp4

Date
01/17/2019
W/O
745520
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16555
Time
1:16 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6358
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_745520_TV22016_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0269
Downstream MH
22 0270
Dir. of Survey
Upstream
Length Surveyed
32.5 ft.
Total Length
32.5 ft.
Structural Index
3
Structural Quick
3626
Structural Rating
30
O&M Index
2
O&M Quick
3226
O&M Rating
18
Overall Index
2
Overall Quick
Overall Rating
48
Pipe schematic from manhole 22 0269 to 22 0270
MH: 22 0269MH: 22 0270upstream0 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"0 ft. MSA - Survey Abandoned - DUE TO DEBRIS0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish7.1 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS19 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"30.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start30.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK32.5 ft. AMH - Downstream Manhole, Survey Begins - 22 026932.5 ft. MWL - Water Level, 20 %of cross sectional area32.5 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    25.4 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

Observations (15)

DistanceCodeObservation
32.5DSZ
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH22 0269
32.5SAP
32.5TFC
32.5MSADUE TO DEBRIS
13.5TFC
2SSS
0MWL
32.5SSS
0MWM
2DAGS
32.5DAGS
2SAP
25.4DSZDEBRIS

Properties (6)

additional_info
SC365674
custom_field_two
5
customer
LACSD
datetime
2019-01-17T01:16:25-08:00
documentation
PRO PIPE
is_lateral_inspection
false