Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2018, 08:35 AM
  • 05 0107_05 0106 _12202018_004735.mp4

Date
12/20/2018
W/O
740131
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05397
Time
12:35 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6253
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_740015_TV05147_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
05 0107
Downstream MH
05 0106
Dir. of Survey
Downstream
Length Surveyed
328 ft.
Total Length
328 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
192
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
192
Pipe schematic from manhole 05 0107 to 05 0106
MH: 05 0107MH: 05 0106downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 01072.5 ft. MGO - General Observation - MAG COAT3.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start50.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish50.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start328 ft. AMH - Downstream Manhole, Survey Ends - 05 0106328 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK328 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    50.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWL
328AMH05 0106
0MWM
2.5MGOMAG COAT
328SAP
328MGOCONNECTION AT MH 3 O'CLOCK
328MGOCONNECTION AT MH 9 O'CLOCK
50.1SAV
0AMH05 0107
50.5SAP
3.2SAV

Properties (6)

additional_info
SC365486
custom_field_two
2
customer
LACSD
datetime
2018-12-20T00:35:13-08:00
documentation
PROPIPE
is_lateral_inspection
false