Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2018, 06:24 AM
  • 05 0097_05 0096 _12192018_231700.mp4

Date
12/19/2018
W/O
740131
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05387
Time
10:24 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6253
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_740015_TV05147_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
05 0097
Downstream MH
05 0096
Dir. of Survey
Downstream
Length Surveyed
314.6 ft.
Total Length
314.6 ft.
Structural Index
5
Structural Quick
5I31
Structural Rating
253
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
5
Overall Quick
Overall Rating
253
Pipe schematic from manhole 05 0097 to 05 0096
MH: 05 0097MH: 05 0096downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 00972.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COAT63.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT314.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314.6 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK314.6 ft. AMH - Downstream Manhole, Survey Ends - 05 0096314.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314.6 ft. MGO - General Observation - CAPPED LATERAL 3 O'CLOCK @ MH

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT

    63.7 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT

Observations (11)

DistanceCodeObservation
314.6SAP
314.6MGOCONNECTION AT MH 9 O'CLOCK
314.6AMH05 0096
0MWM
2.1SAP
0MWL
63.7SRVSPORADICALLY THROUGHOUT
2.1MGOMAG COAT
314.6SRV
314.6MGOCAPPED LATERAL 3 O'CLOCK @ MH
0AMH05 0097

Properties (6)

additional_info
SC365486
custom_field_two
2
customer
LACSD
datetime
2018-12-19T22:24:16-08:00
documentation
PROPIPE
is_lateral_inspection
false