Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2018, 07:37 AM
  • 05 0094_05 0093 _12192018_234300.mp4

Date
12/19/2018
W/O
740131
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05384
Time
11:37 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6253
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_740015_TV05147_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
05 0094
Downstream MH
05 0093
Dir. of Survey
Downstream
Length Surveyed
87.1 ft.
Total Length
87.1 ft.
Structural Index
4
Structural Quick
5B3B
Structural Rating
136
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
136
Pipe schematic from manhole 05 0094 to 05 0093
MH: 05 0094MH: 05 0093downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 00940 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK3.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.5 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT87.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish87.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK87.1 ft. AMH - Downstream Manhole, Survey Ends - 05 009387.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT

    4.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT

Observations (10)

DistanceCodeObservation
0AMH05 0094
87.1SAP
87.1MGOCONNECTION AT MH 3 O'CLOCK
0MWL
3.4SAP
0MWM
87.1AMH05 0093
4.5SRVSPORADICALLY THROUGHOUT
0MGOCONNECTION AT MH 9 O'CLOCK
87.1SRV

Properties (6)

additional_info
SC365486
custom_field_two
2
customer
LACSD
datetime
2018-12-19T23:37:59-08:00
documentation
PROPIPE
is_lateral_inspection
false