Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2018, 09:09 AM
  • 05 0138_05 2166 _12202018_012434.mp4

Date
12/20/2018
W/O
740131
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05430
Time
1:09 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6253
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_740015_TV05147_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
05 0138
Downstream MH
05 2166
Dir. of Survey
Downstream
Length Surveyed
165.7 ft.
Total Length
165.7 ft.
Structural Index
3
Structural Quick
543F
Structural Rating
119
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
119
Pipe schematic from manhole 05 0138 to 05 2166
MH: 05 0138MH: 05 2166downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 01380 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start145.3 ft. SRV - Surface Reinforcement Visible, from 02 to 05 o'clock, within 8 inches of joint: NO, Start - SPORADICALLY THROUGHOUT165.7 ft. MGO - General Observation - CONNECTION AT MH 12 O'CLOCK165.7 ft. SRV - Surface Reinforcement Visible, from 02 to 05 o'clock, within 8 inches of joint: NO, Finish165.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK165.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish165.7 ft. AMH - Downstream Manhole, Survey Ends - 05 2166

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 02 to 05 o'clock, within 8 inches of joint: NO, Start - SPORADICALLY THROUGHOUT

    145.3 ft. - Surface Reinforcement Visible, from 02 to 05 o'clock, within 8 inches of joint: NO, Start - SPORADICALLY THROUGHOUT

Observations (12)

DistanceCodeObservation
2.1MGOMAG COAT
0AMH05 0138
145.3SRVSPORADICALLY THROUGHOUT
165.7MGOCONNECTION AT MH 12 O'CLOCK
165.7SRV
2.3SAP
0MGOCONNECTION AT MH 6 O'CLOCK
165.7MGOCONNECTION AT MH 9 O'CLOCK
0MWM
165.7SAP
165.7AMH05 2166
0MWL

Properties (6)

additional_info
SC365486
custom_field_two
3
customer
LACSD
datetime
2018-12-20T01:09:55-08:00
documentation
PROPIPE
is_lateral_inspection
false