Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 19, 2018, 10:43 AM
  • 05 0132_05 0131 _12192018_025551.mp4

Date
12/19/2018
W/O
740131
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05422
Time
2:43 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6252
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_740015_TV05147_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
05 0132
Downstream MH
05 0131
Dir. of Survey
Downstream
Length Surveyed
333 ft.
Total Length
333 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
3
Overall Quick
Overall Rating
320
Pipe schematic from manhole 05 0132 to 05 0131
MH: 05 0132MH: 05 0131downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 01320 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK3.3 ft. MGO - General Observation - MAG COAT3.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start25.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start333 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK333 ft. AMH - Downstream Manhole, Survey Ends - 05 0131333 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: NO, Start

    25.8 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start

Observations (12)

DistanceCodeObservation
333MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 9 O'CLOCK
333AMH05 0131
25.8DSZ
0MWL
333SAP
3.3MGOMAG COAT
0AMH05 0132
0MWM
333DSZ
3.3SAP
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC365485
custom_field_two
3
customer
LACSD
datetime
2018-12-19T02:43:27-08:00
documentation
PROPIPE
is_lateral_inspection
false