Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 20, 2016, 07:31 AM
  • 05 0343_05 0342_20160119_233328.mp4

Date
01/19/2016
W/O
536429
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00432
PipeID
P05557
Time
11:31 PM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3118
Sewer Name
05 DISTRICT #5 MAIN RELIEF TRUNK
City
HAWTHORNE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
WO_536429_TV05014_DEC2015
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
05 0343
Downstream MH
05 0342
Dir. of Survey
Downstream
Length Surveyed
491.1 ft.
Total Length
491.1 ft.
Structural Index
3
Structural Quick
3S00
Structural Rating
294
O&M Index
2
O&M Quick
412S
O&M Rating
200
Overall Index
3
Overall Quick
Overall Rating
494
Pipe schematic from manhole 05 0343 to 05 0342
MH: 05 0343MH: 05 0342downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 03430 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 55 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAGNESIUM H.O. START3 ft. SRP - Surface Reinforcement Projecting, from 01 to 03 o'clock, within 8 inches of joint: YES3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT489.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish490 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish491.1 ft. AMH - Downstream Manhole, Survey Ends - 05 0342

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Finish

    489.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

  • Downstream Manhole, Survey Ends - 05 0342

    491.1 ft. - Downstream Manhole, Survey Ends - 05 0342

Observations (10)

DistanceCodeObservation
2DAGS
0AMH05 0343
0MWM
491.1AMH05 0342
490SAP
489.9DAGS
3SRP
3SAPSPORADICALLY THROUGHOUT
2MGOMAGNESIUM H.O. START
0MWL

Properties (6)

additional_info
SC225503
custom_field_two
3
customer
LACSD
datetime
2016-01-19T23:31:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false