Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 7, 2019, 07:16 AM
  • 16 0571_16 0570 _11062019_232551.mp4

Date
11/06/2019
W/O
792799
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00659
PipeID
P13622
Time
11:16 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7112
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
WO_792799_TV16077_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0571
Downstream MH
16 0570
Dir. of Survey
Downstream
Length Surveyed
255 ft.
Total Length
255 ft.
Structural Index
4
Structural Quick
5H3I
Structural Rating
388
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
3
Overall Quick
Overall Rating
490
Pipe schematic from manhole 16 0571 to 16 0570
MH: 16 0571MH: 16 0570downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05710 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start8.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"17.9 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start32.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"89 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"93.3 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"108.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"181.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"217.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"255 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish255 ft. AMH - Downstream Manhole, Survey Ends - 16 0570255 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish255 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish255 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    17.9 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2SAP
2DAGS
0MWL
217.8TFC
129.4TFC
255SAP
181.8TFC
0AMH16 0571
255AMH16 0570
255DAGS
255SRV
17.9SRV
108.9TFC
161.4TFC
93.3TFA
0MWM
32.1TF
8.3TFC
255MGOACTIVE CONNECTION AT MH 9 O'CLOCK
89TFC

Properties (6)

additional_info
SC378743
custom_field_two
2
customer
LACSD
datetime
2019-11-06T23:16:21-08:00
documentation
PRO PIPE
is_lateral_inspection
false