18 0126_18 0125 _11122017_044359.mp4

0 ft. - Upstream Manhole, Survey Begins - 18 0126

0.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
6.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8.8 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
110.7 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES
117.7 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 427.7 | SRV | — |
| 427.7 | SAP | — |
| 427.7 | DSZ | — |
| 0.1 | DAGS | — |
| 1 | MGO | MAG COAT THROUGHOUT |
| 6.1 | SSS | — |
| 110.7 | SRV | — |
| 427.7 | AMH | 18 0125 |
| 427 | DAGS | — |
| 117.7 | SRV | — |
| 0 | MWL | — |
| 0.1 | MWM | — |
| 2.1 | SAP | — |
| 427.7 | SSS | — |
| 8.8 | DSZ | — |
| 0 | AMH | 18 0126 |