Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 21, 2019, 10:51 AM
  • 16 0617_16 0616_10212019_031751.mp4

Date
10/21/2019
W/O
792814
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00664
PipeID
P13667
Time
3:51 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7049
Sewer Name
16 PASADENA EAST-WEST INTERCEPTOR TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
09
Purpose
Routine Assessment
Project
WO_792814_TV16030_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
16 0617
Downstream MH
16 0616
Dir. of Survey
Downstream
Length Surveyed
314.4 ft.
Total Length
314.4 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
434
Pipe schematic from manhole 16 0617 to 16 0616
MH: 16 0617MH: 16 0616downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 16 06170 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start145 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN236.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN312 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish312 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG313 ft. MGO - General Observation - COCKROACHES IN MANHOLE313 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE313 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish313 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish314.4 ft. AMH - Downstream Manhole, Survey Ends - 16 0616

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    313 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
236.1TBOPEN
2SZ70% MAG
313MGOCOCKROACHES IN MANHOLE
145TBOPEN
2SSS
0MWM
314.4AMH16 0616
2SAP
313MGOCONN @ MH 9 O'CLOCK/ACTIVE
2DAGS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
313SAP
312SSS
312SZ70% MAG
0AMH16 0617
0MWL
313DAGS

Properties (6)

additional_info
SC378718
custom_field_two
2
customer
LACSD
datetime
2019-10-21T03:51:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false