Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 4, 2016, 08:51 AM
  • F 0077_F 0254_04052016_015309.mp4

Date
05/04/2016
W/O
563445
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00036
PipeID
P10178
Time
1:51 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3338
Sewer Name
F JOINT OUTFALL F - UNIT 3A RELIEF
City
CERRITOS
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
WO_563445_TV02208_APRIL2015
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
66 in.
Upstream MH
F 0077
Downstream MH
F 0254
Dir. of Survey
Downstream
Length Surveyed
15 ft.
Total Length
15 ft.
Structural Index
4
Structural Quick
5333
Structural Rating
24
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
30
Pipe schematic from manhole F 0077 to F 0254
MH: F 0077MH: F 0254downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 00772 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start15 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish15 ft. AMH - Downstream Manhole, Survey Ends - F 025415 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish15 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWL
15SAP
0MWM
2SRV
15AMHF 0254
15SRV
0AMHF 0077
2SAP
2DAGS
15DAGS

Properties (7)

additional_info
SC305615
custom_field_two
2
customer
LACSD
datetime
2016-05-04T01:51:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
19741031