Wastewater/Activity/PacpInspection/1.0Nov 13, 2019, 08:44 AM
  • 18 0205_18 0204_11132019_025306.mp4

Date
11/13/2019
W/O
0801678
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00695
PipeID
P14030
Time
12:44 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
H1308
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
13
Purpose
Maintenance Related
Project
20191107MDM_ORR_AND_DAY_ROAD_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
18 0205
Downstream MH
18 0204
Dir. of Survey
Downstream
Length Surveyed
399.2 ft.
Total Length
399.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
5141
O&M Rating
16
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 18 0205 to 18 0204
MH: 18 0205MH: 18 0204downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:45AM0 ft. MWM - Water Mark, 70 %of cross sectional area0 ft. MWL - Water Level, 50 %of cross sectional area2 ft. DSZ - Deposits Settled Other, 40 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW20.8 ft. DSZ - Deposits Settled Other, 40 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE UNDER FLOW20.8 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW SPORATIC20.8 ft. MWL - Water Level, 30 %of cross sectional area107.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW SPORATIC107.2 ft. MWL - Water Level, 20 %of cross sectional area107.2 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE UNDER FLOW SPORATIC175.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE UNDER FLOW SPORATIC389 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - DEBRIE UNDER FLOW399.2 ft. AMH - Downstream Manhole, Survey Ends - 3:20AM

Observation photos (3)

  • Deposits Settled Other,  40 %of cross sectional area, at 09 o'clock,  , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW

    2 ft. - Deposits Settled Other, 40 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW SPORATIC

    20.8 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW SPORATIC

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW SPORATIC

    107.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW SPORATIC

Observations (13)

DistanceCodeObservation
107.2DSZDEBRIE UNDER FLOW SPORATIC
0AMH2:45AM
175.4DSZDEBRIE UNDER FLOW SPORATIC
107.2MWL
20.8DSZDEBRIE UNDER FLOW
20.8DSZDEBRIE UNDER FLOW SPORATIC
107.2DSZDEBRIE UNDER FLOW SPORATIC
389DSZDEBRIE UNDER FLOW
20.8MWL
399.2AMH3:20AM
0MWM
0MWL
2DSZDEBRIE UNDER FLOW

Properties (5)

additional_info
LOOKING FOR DEBRIE IN LINE
customer
LACSD
datetime
2019-11-13T00:44:39-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection