18 0207_18 0206_1192019_012235.mp4
205.1 ft. - Deposits Settled Other, 30 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE UNDER FLOW
216.9 ft. - Deposits Settled Other, 30 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - ROCK OR CONCRETE
217.8 ft. - General Photograph - DEBRIE UNDER FLOW
421.3 ft. - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start - DEBRIE UNDER FLOW
425.1 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, - POSSIBLE DEBRIE UNDER FLOW
| Distance | Code | Observation |
|---|---|---|
| 258.3 | MWL | — |
| 0 | MWL | — |
| 425.1 | DSZ | DEBRIE UNDER FLOW |
| 205.1 | DSZ | DEBRIE UNDER FLOW |
| 425.1 | DSZ | POSSIBLE DEBRIE UNDER FLOW |
| 216.9 | DSZ | ROCK OR CONCRETE |
| 258.3 | MWM | — |
| 570.8 | MWL | — |
| 611.2 | AMH | 2:10AM |
| 425.1 | MWL | — |
| 224.8 | DSZ | DEBRIE UNDER FLOW |
| 570.8 | MWM | — |
| 421.3 | DSZ | DEBRIE UNDER FLOW |
| 0 | AMH | 1:15AM |
| 217.8 | MGP | DEBRIE UNDER FLOW |
| 0 | MWM | — |