Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2019, 08:00 PM
  • H 0514_H 0513_1162019_121923.mp4

Date
11/06/2019
W/O
0798185
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00183
PipeID
P20465
Time
12:00 PM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8122
Sewer Name
H JOINT OUTFALL H - UNIT 7B
City
INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Capital Improvement Program Assesment
Project
20191106MI_JOINT_OUTFALL_H_UNIT_7B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
H 0513
Downstream MH
H 0514
Dir. of Survey
Upstream
Length Surveyed
2.1 ft.
Total Length
2.1 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
5
O&M Quick
5141
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
17
Pipe schematic from manhole H 0513 to H 0514
MH: H 0513MH: H 0514upstream0 ft. MSA - Survey Abandoned - HIGH WATER0.1 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES0.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES0.1 ft. LU - Alignment Up, 45 %0.1 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES - MAG COAT, 60%0.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES2.1 ft. MGP - General Photograph - AIRLINE2.1 ft. AMH - Downstream Manhole, Survey Begins - 12:15 PM2.1 ft. MWM - Water Mark, 100 %of cross sectional area2.1 ft. MWL - Water Level, 100 %of cross sectional area

Observation photos (3)

  • Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (10)

DistanceCodeObservation
2SRP
0MGPAIRLINE
2SSS
0AMH12:15 PM
2LU
2SZMAG COAT, 60%
0MWM
0MWL
2SAP
2.1MSAHIGH WATER

Properties (6)

additional_info
VIEW OF THE UPLEG PIPE OF THE D/S SIPHON (S/W BARREL)
custom_field_two
2
customer
LACSD
datetime
2019-11-06T12:00:36-08:00
documentation
IGNACIO, FRANKLIN, RUVALCABA, BRAR
is_lateral_inspection
false