Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 9, 2019, 09:25 AM
  • 22 0565B_22 0565A _09092019_032322.mp4

Date
09/09/2019
W/O
787674
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00791
PipeID
P16911
Time
2:25 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6958
Sewer Name
22 BEN LOMOND TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_787674_TV22006_SEP2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0565B
Downstream MH
22 0565A
Dir. of Survey
Downstream
Length Surveyed
35.7 ft.
Total Length
35.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 22 0565B to 22 0565A
MH: 22 0565BMH: 22 0565Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 22 0565B2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"8.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"33.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish33.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish35.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK35.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0565A

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MWL
33.2SAP
35.7MGOCONNECTION AT MH 3 O'CLOCK
2DAGS
0MGOCONNECTION AT MH 9 O'CLOCK
33.2DAGS
0MWM
8.8TFC
35.7AMH22 0565A
2SAP
3.9TFC
0VC
0AMH22 0565B

Properties (6)

additional_info
SC378564
custom_field_two
3
customer
LACSD
datetime
2019-09-09T02:25:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false