Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2019, 10:16 AM
  • B 0454A_B 0454_07262019_032332.mp4

Date
07/26/2019
W/O
766300
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00093
PipeID
P08967
Time
3:16 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
6075
Sewer Name
B JOINT OUTFALL B - UNIT 5C
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_766300_TV16079_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
B 0454A
Downstream MH
B 0454
Dir. of Survey
Downstream
Length Surveyed
123.3 ft.
Total Length
123.3 ft.
Structural Index
3
Structural Quick
3C00
Structural Rating
66
O&M Index
2
O&M Quick
412D
O&M Rating
54
Overall Index
3
Overall Quick
Overall Rating
120
Pipe schematic from manhole B 0454A to B 0454
MH: B 0454AMH: B 0454downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 0454A0 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - MAGNEZIUM H.O COATING ATTATCHED9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"19.1 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - POSSIBLE AGGREGATE24.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"76.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"81 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES94.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"123 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish123 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish123.2 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH123.3 ft. AMH - Downstream Manhole, Survey Ends - B 0454

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING ATTATCHED

    2 ft. - General Observation - MAGNEZIUM H.O COATING ATTATCHED

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - POSSIBLE AGGREGATE

    19.1 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - POSSIBLE AGGREGATE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    81 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
76.2TFC
0AMHB 0454A
123DAGS
0MWM
123.3AMHB 0454
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
9TFC
19.1SAVPOSSIBLE AGGREGATE
123.2MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
0DAGS
123SAV
94.4TFC
24.1TFC
81SAV
2MGOMAGNEZIUM H.O COATING ATTATCHED
0MWL

Properties (6)

additional_info
SC377945
custom_field_two
3
customer
LACSD
datetime
2019-07-26T03:16:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false