21 0590_21 0477 _10212019_070753.mp4

0 ft. - Upstream Manhole, Survey Begins - 21 0590

5.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
7.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8.4 ft. - Alignment Right, 20 %, Start
11.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

46.1 ft. - Vermin Cockroach, within 8 inches of joint: YES - COCKROACHES THROUGHOUT LINE
53 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 60 | SRV | — |
| 60 | SAP | — |
| 46.1 | VC | COCKROACHES THROUGHOUT LINE |
| 0 | AMH | 21 0590 |
| 53 | SRV | — |
| 7.4 | SAP | — |
| 0 | MWM | — |
| 63 | AMH | 21 0477 |
| 62 | DAGS | — |
| 5.1 | DAGS | — |
| 25.6 | LR | — |
| 0 | MWL | — |
| 38.8 | TB | — |
| 1 | MGO | ACTIVE CONNECTION AT 9'0 IN MH |
| 11.1 | SSS | — |
| 62.9 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 60 | SSS | — |
| 8.4 | LR | — |