21 1077_21 1078 _10212019_074459.mp4

0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

0 ft. - Downstream Manhole, Survey Begins - 21 1078

0 ft. - General Observation - CONNECTION AT MH 9 O'CLOCK

7.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
7.4 ft. - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
7.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
26.5 ft. - Deposits Settled Compacted, 25 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 7.4 | SRP | — |
| 35 | DAGS | — |
| 0 | MGO | HEAVY FLOW FROM CONNECTION |
| 0 | MWM | — |
| 0 | DAGS | — |
| 35.4 | SRP | — |
| 0 | AMH | 21 1078 |
| 26.5 | DSC | — |
| 7.4 | SAP | — |
| 35.4 | DSC | — |
| 35.4 | SAP | — |
| 35.4 | MSA | SINKING INTO DEBRIS |
| 7.1 | SRV | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |