Wastewater/Activity/PacpInspection/1.0Aug 27, 2019, 09:16 AM
  • 05 0859_05 0858 _08272019_021923.mp4

Date
08/27/2019
W/O
782303
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00457
PipeID
P06089
Time
2:16 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6816
Sewer Name
05 IMPERIAL HIGHWAY EXTENSION TRUNK
City
LENNOX
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782303_TV05334_AUG2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 0858
Downstream MH
05 0859
Dir. of Survey
Upstream
Length Surveyed
46.4 ft.
Total Length
46.4 ft.
Structural Index
2
Structural Quick
4334
Structural Rating
42
O&M Index
2
O&M Quick
3128
O&M Rating
19
Overall Index
2
Overall Quick
Overall Rating
61
Pipe schematic from manhole 05 0858 to 05 0859
MH: 05 0858MH: 05 0859upstream0 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish0 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. OBZ - Obstacles Other, 15 %of cross sectional area, at 06 o'clock - UNKNOWN0 ft. MSA - Survey Abandoned - UNABLE TO GET PAST0.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish13 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.3 ft. MMC - Material Change, Cast Iron18.8 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES19.6 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"28 ft. FM - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES31.6 ft. FM - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES35.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start35.4 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start35.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"36.8 ft. JOM - Joint Offset Medium37.5 ft. JSM - Joint Separated Medium39.3 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6"39.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"42.1 ft. JSL - Joint Separated Large42.1 ft. FS - Fracture Spiral, from 06 to 10 o'clock, within 8 inches of joint: YES46.4 ft. MWL - Water Level, 10 %of cross sectional area46.4 ft. AMH - Downstream Manhole, Survey Begins - 05 085846.4 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (11)

  • Joint Separated Large

    4.3 ft. - Joint Separated Large

  • Fracture Spiral, from 06 to 10 o'clock, within 8 inches of joint: YES

    4.3 ft. - Fracture Spiral, from 06 to 10 o'clock, within 8 inches of joint: YES

  • Joint Separated Medium

    8.9 ft. - Joint Separated Medium

  • Joint Offset Medium

    9.6 ft. - Joint Offset Medium

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    11 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    11 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

    14.8 ft. - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

    18.4 ft. - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES

    27.6 ft. - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Material Change, Cast Iron

    29.1 ft. - Material Change, Cast Iron

  • Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    33.4 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
0MWL
18.4FM
26.8TBC
29.1MMC
46.4MWLS
46.4SCP
6.7TB
27.6FH2
46DAGS
14.8FM
0AMH05 0858
46.4OBZUNKNOWN
46.4MSAUNABLE TO GET PAST
9.6JOM
11DAGS
8.9JSM
4.3JSL
4.3FS
11MWLS
7.1TB
0MWM
11TF
33.4SCP

Properties (5)

custom_field_two
5
customer
LACSD
datetime
2019-08-27T02:16:42-07:00
documentation
PRO PIPE
is_lateral_inspection