Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 3, 2019, 08:51 AM
  • E 0021_E 0126_10032019_020255.mp4

Date
10/03/2019
W/O
787679
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00027
PipeID
P23241
Time
1:51 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7055
Sewer Name
E JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_787679_TV30070_SEP2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
E 0021
Downstream MH
E 0126
Dir. of Survey
Downstream
Length Surveyed
230.1 ft.
Total Length
230.1 ft.
Structural Index
3
Structural Quick
3H2D
Structural Rating
184
O&M Index
2
O&M Quick
312P
O&M Rating
169
Overall Index
2
Overall Quick
Overall Rating
353
Pipe schematic from manhole E 0021 to E 0126
MH: E 0021MH: E 0126downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00210 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.7 ft. MGO - General Observation - MAG COATING THROUGHOUT PIPE34.9 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start98.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start171.9 ft. TBB - Tap Break-In Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.2 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish219.2 ft. DSC - Deposits Settled Compacted, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO225.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish230 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish230 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish230 ft. MGO - General Observation - CONNECTION AT 3 O'CLOCK230.1 ft. AMH - Downstream Manhole, Survey Ends - E 0126

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT PIPE

    4.7 ft. - General Observation - MAG COATING THROUGHOUT PIPE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    98.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
4.7SAP
0AMHE 0021
230DAGS
0MWM
230.1AMHE 0126
4.7MGOMAG COATING THROUGHOUT PIPE
34.9DSC
219.2DSC
171.9TBB
225.9SAP
98.1SSS
0MWL
230SSS
0DAGS
219.2DSC
230MGOCONNECTION AT 3 O'CLOCK

Properties (6)

additional_info
SC378655
custom_field_two
3
customer
LACSD
datetime
2019-10-03T01:51:42-07:00
documentation
PROPIPE
is_lateral_inspection
false