Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 28, 2019, 05:22 AM
  • 14 0302A_14 0302_08272019_223652.mp4

Date
08/27/2019
W/O
782143
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P18367
Time
10:22 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6884
Sewer Name
14 TRUNK "F"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_782143_TV14028_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
14 0302A
Downstream MH
14 0302
Dir. of Survey
Downstream
Length Surveyed
346.1 ft.
Total Length
346.1 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
340
O&M Index
2
O&M Quick
2P00
O&M Rating
172
Overall Index
2
Overall Quick
Overall Rating
512
Pipe schematic from manhole 14 0302A to 14 0302
MH: 14 0302AMH: 14 0302downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECION AT 3'00 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 14 0302A2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start254.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS344.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish344.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish344.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish344.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish346.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE346.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0302

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    346.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
344.3SSS
344.3DAGS
346.1MGOCOCKROACHES IN MANHOLE
2SAP
2SSS
344.3DSZ
346.1AMH14 0302
0MWL
0MGOACTIVE CONNECION AT 3'0
344.3SAP
2DAGS
0MGOCOCKROACHES IN MANHOLE
0AMH14 0302A
254.7DSZDEBRIS

Properties (6)

additional_info
SC378600
custom_field_two
3
customer
LACSD
datetime
2019-08-27T22:22:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false