Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 29, 2019, 08:44 AM
  • 14 0856_14 0299_08292019_015638.mp4

Date
08/29/2019
W/O
782143
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P18363
Time
1:44 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6885
Sewer Name
14 TRUNK "F"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782143_TV14028_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0856
Downstream MH
14 0299
Dir. of Survey
Downstream
Length Surveyed
408.3 ft.
Total Length
408.3 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
405
O&M Index
2
O&M Quick
412O
O&M Rating
166
Overall Index
2
Overall Quick
Overall Rating
571
Pipe schematic from manhole 14 0856 to 14 0299
MH: 14 0856MH: 14 0299downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 08560 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start405.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish405.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish405.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish408.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0299

Observation photos (4)

  • Upstream Manhole, Survey Begins - 14 0856

    0 ft. - Upstream Manhole, Survey Begins - 14 0856

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWM
0AMH14 0856
405.9DAGS
2DAGS
0MWL
408.3AMH14 0299
2SSS
2SAP
405.9SAP
405.9SSS

Properties (6)

additional_info
SC378601
custom_field_two
3
customer
LACSD
datetime
2019-08-29T01:44:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false