Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 27, 2019, 09:35 AM
  • 14 0307_14 0306A_08272019_024328.mp4

Date
08/27/2019
W/O
782143
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P18374
Time
2:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6883
Sewer Name
14 TRUNK "F"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_782143_TV14028_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
14 0306A
Downstream MH
14 0307
Dir. of Survey
Upstream
Length Surveyed
144.5 ft.
Total Length
144.5 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
140
O&M Index
2
O&M Quick
2E00
O&M Rating
56
Overall Index
2
Overall Quick
Overall Rating
196
Pipe schematic from manhole 14 0306A to 14 0307
MH: 14 0306AMH: 14 0307upstream0 ft. AMH - Upstream Manhole, Survey Ends - 14 03072.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish142.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start142.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start142.5 ft. MGO - General Observation - MAG COATING THROUGHOUT142.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start144.5 ft. MWL - Water Level, 15 %of cross sectional area144.5 ft. MWM - Water Mark, 25 %of cross sectional area144.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE144.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK144.5 ft. AMH - Downstream Manhole, Survey Begins - 14 0306A

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2DAGS
0MWL
2SAP
2MGOMAG COATING THROUGHOUT
2SSS
142.4DAGS
0MWM
142.4SSS
142.4SAP
0MGOCOCKROACHES IN MANHOLE
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0AMH14 0306A
144.5AMH14 0307

Properties (6)

additional_info
SC378468
custom_field_two
3
customer
LACSD
datetime
2019-08-27T02:35:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false