14 0306A_14 0306_08272019_023028.mp4

0 ft. - Downstream Manhole, Survey Begins - 14 0306
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - General Observation - MAG COATING THROUGHOUT
7.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

93.6 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"
348.9 ft. - General Observation - COCKROACHES IN MANHOLE
| Distance | Code | Observation |
|---|---|---|
| 7.1 | SRV | — |
| 93.6 | TBA | — |
| 2 | SAP | — |
| 348.9 | MGO | COCKROACHES IN MANHOLE |
| 0 | MWL | — |
| 347.2 | DAGS | — |
| 2 | DAGS | — |
| 2 | MGO | MAG COATING THROUGHOUT |
| 348.9 | AMH | 14 0306A |
| 0 | AMH | 14 0306 |
| 347.2 | SSS | — |
| 80 | SRV | — |
| 347.2 | SAP | — |
| 348.9 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOCK |
| 2 | SSS | — |
| 0 | MWM | — |