Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 28, 2019, 08:20 AM
  • 14 0298_14 0297_08282019_013640.mp4

Date
08/28/2019
W/O
782143
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P18361
Time
1:20 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6884
Sewer Name
14 TRUNK "F"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782143_TV14028_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0298
Downstream MH
14 0297
Dir. of Survey
Downstream
Length Surveyed
412.2 ft.
Total Length
412.2 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
410
O&M Index
2
O&M Quick
2O00
O&M Rating
164
Overall Index
2
Overall Quick
Overall Rating
574
Pipe schematic from manhole 14 0298 to 14 0297
MH: 14 0298MH: 14 0297downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02982 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start410.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish410.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish410.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish412.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0297

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2SAP
410.6SAP
412.2AMH14 0297
0MWM
2SSS
410.6SSS
410.6DAGS
0MWL
2DAGS
0AMH14 0298

Properties (6)

additional_info
SC378600
custom_field_two
3
customer
LACSD
datetime
2019-08-28T01:20:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false