Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2019, 12:36 PM
  • 15 0776_15 0775_1162019_043852.mp4

Date
11/06/2019
W/O
0793083
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00593
PipeID
P12977
Time
4:36 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1300R
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Maintenance Related
Project
20191106MDM_ARACIA_SIERRA_MADRE_TRUNK_SECTS_2_5
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
15 0776
Downstream MH
15 0775
Dir. of Survey
Downstream
Length Surveyed
399.9 ft.
Total Length
399.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3126
O&M Rating
15
Overall Index
2
Overall Quick
Overall Rating
15
Pipe schematic from manhole 15 0776 to 15 0775
MH: 15 0776MH: 15 0775downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:40AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE90.1 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-70% ROOTS95.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped98 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped119.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped122.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped142.1 ft. RTB - Roots Tap Barrell, from 01 to 03 o'clock, 15 %, within 8 inches of joint: YES143.2 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Open-100% ROOTS147.2 ft. TFD - Tap Factory Made Defective, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open-90% ROOTS168.5 ft. TFD - Tap Factory Made Defective, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open-100% ROOTS217.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open232.4 ft. TFD - Tap Factory Made Defective, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open-100% ROOTS GREASE235.5 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-60% ROOTS GREASE244.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped251.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active318 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open399.9 ft. AMH - Downstream Manhole, Survey Ends - 5:05AM

Observation photos (1)

  • Roots Tap Barrell, from 01 to 03 o'clock, 15 %, within 8 inches of joint: YES

    142.1 ft. - Roots Tap Barrell, from 01 to 03 o'clock, 15 %, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
0MWL
244.6TFCCapped
98TFCCapped
119.5TFCCapped
217.4TFOpen
143.2TFDOpen-100% ROOTS
0AMH4:40AM
168.5TFDOpen-100% ROOTS
0MWM
95.3TFCCapped
251.2TFActive
142.1RTB
399.9AMH5:05AM
0MGOMH CONN 3:00 ACTIVE
235.5TFDOpen-60% ROOTS GREASE
147.2TFDOpen-90% ROOTS
232.4TFDOpen-100% ROOTS GREASE
122.3TFCCapped
90.1TFDOpen-70% ROOTS
318TFOpen

Properties (5)

additional_info
POST ROOT EVALUATION ONLY
customer
LACSD
datetime
2019-11-06T04:36:12-08:00
documentation
MARTIN,OLIVER 111,CASTILLO
is_lateral_inspection
false