Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 4, 2019, 08:00 PM
  • 02 1438_02 1437_1142019_120909.mp4

Date
11/04/2019
W/O
798059
Weather
Dry
Operator/Surveyor
BRAR
Sewer ID
Z00307
PipeID
P04677
Time
12:00 PM
Certificate
U-0618-07030022
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8119
Sewer Name
02 TRACT #5445 TRUNK
City
EAST LOS ANGELES
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
13
Purpose
Routine Assessment
Project
20191104SB_TRACT_5445_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 1438
Downstream MH
02 1437
Dir. of Survey
Downstream
Length Surveyed
242.1 ft.
Total Length
242.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 02 1438 to 02 1437
MH: 02 1438MH: 02 1437downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:06 PM0.1 ft. MWM - Water Mark, 20 %of cross sectional area0.1 ft. MWL - Water Level, 15 %of cross sectional area8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG COAT30 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEPOSITS71.6 ft. MGP - General Photograph142.3 ft. MGP - General Photograph215.2 ft. MGP - General Photograph239.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish239.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - DEPOSITS SETTLED239.1 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - MAG242 ft. MGO - General Observation - ROACHES IN DS MH242.1 ft. AMH - Downstream Manhole, Survey Ends - 12:30 PM

Observation photos (5)

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG COAT

    8 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG COAT

  • General Photograph

    71.6 ft. - General Photograph

  • General Photograph

    142.3 ft. - General Photograph

  • General Photograph

    215.2 ft. - General Photograph

  • General Observation - ROACHES IN DS MH

    242 ft. - General Observation - ROACHES IN DS MH

Observations (14)

DistanceCodeObservation
0.1MWM
239.1DAGS
215.2MGP
239.1DSZDEPOSITS SETTLED
8DAGS
30DSZDEPOSITS
8SZ70% MAG COAT
0.1MWL
242.1AMH12:30 PM
71.6MGP
239.1SZMAG
142.3MGP
0AMH12:06 PM
242MGOROACHES IN DS MH

Properties (6)

additional_info
U-0618-0703002249
custom_field_two
4
customer
LACSD
datetime
2019-11-04T12:00:44-08:00
documentation
BRAR, FRANKLIN, IGNATIO, RUVALCABA
is_lateral_inspection
false