Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 5, 2019, 10:05 AM
  • 16 0636_16 0635_1152019_021705.mp4

Date
11/05/2019
W/O
0792636
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00663
PipeID
P13703
Time
2:05 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1299
Sewer Name
16 PARSHALL FLUME AT MARMION WAY
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
16
Purpose
Routine Assessment
Project
20191104MDM_PARSHALL_FLUME_AT_MARMION_WAY
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
16 0635
Downstream MH
16 0636
Dir. of Survey
Upstream
Length Surveyed
23.9 ft.
Total Length
23.9 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 16 0635 to 16 0636
MH: 16 0635MH: 16 0636upstream0 ft. AMH - Upstream Manhole, Survey Ends(FLUME AT MH#636) - 2:25AM1.1 ft. FC - Fracture Circumferential, from 07 to 05 o'clock, within 8 inches of joint: NO - SLIGHT15.3 ft. MGO - General Observation - 10" VCP23.9 ft. MWL - Water Level, 5 %of cross sectional area23.9 ft. AMH - Downstream Manhole, Survey Begins - 2:15AM23.9 ft. MGO - General Observation - MH CONN 9:00 OPEN23.9 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (2)

  • General Observation - 10" VCP

    8.6 ft. - General Observation - 10" VCP

  • Upstream Manhole, Survey Ends(FLUME AT MH#636) - 2:25AM

    23.9 ft. - Upstream Manhole, Survey Ends(FLUME AT MH#636) - 2:25AM

Observations (7)

DistanceCodeObservation
0MWL
0AMH2:15AM
8.6MGO10" VCP
22.8FCSLIGHT
0MGOMH CONN 9:00 OPEN
23.9AMH2:25AM
0MWM

Properties (6)

custom_field_three
1 SLIGHT FRACTURE
custom_field_two
4
customer
LACSD
datetime
2019-11-05T02:05:46-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false