Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 1, 2019, 11:06 AM
  • 15 0822_15 0821_1112019_040754.mp4

Date
11/01/2019
W/O
073082
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00593
PipeID
P13023
Time
4:06 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1294R
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
SIERRA MADRE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
01
Purpose
Maintenance Related
Project
20191030MDM_ARCADIA_SIERRA_MADRE_TRUNK_SECTS_2_5
Material
NRCP
Shape
Circular
Height
9.420000076293945 in.
Upstream MH
15 0822
Downstream MH
15 0821
Dir. of Survey
Downstream
Length Surveyed
323.1 ft.
Total Length
323.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 15 0822 to 15 0821
MH: 15 0822MH: 15 0821downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:10AM0 ft. MWM - Water Mark, 30 %of cross sectional area37.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - Open79.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open133.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - Open157.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - Open220.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open258.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open291.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open323.1 ft. AMH - Downstream Manhole, Survey Ends - 4:30AM

Observations (11)

DistanceCodeObservation
0MWL
157.4TBOpen
220.3TBOpen
79.2TBOpen
323.1AMH4:30AM
258.1TBOpen
291.2TBOpen
0AMH4:10AM
0MWM
133.5TBOpen
37.4TBOpen

Properties (5)

customer
LACSD
datetime
2019-11-01T04:06:44-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
lining
PVCP