30 0226_30 0323_10252019_123105.mp4
0 ft. - Upstream Manhole, Survey Begins - 12:20 PM
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
17.5 ft. - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YESR, Start
29.1 ft. - General Photograph
32.6 ft. - General Photograph
47 ft. - General Photograph
85.1 ft. - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YESR
102.9 ft. - General Photograph
107.4 ft. - Roots Tap Joint, at 09 o'clock, 5 %, within 8 inches of joint: YESR
109.1 ft. - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YESR, Finish
| Distance | Code | Observation |
|---|---|---|
| 2 | CM | — |
| 107.4 | RTJ | — |
| 85.1 | RFJ | — |
| 0.1 | MWL | — |
| 109.1 | SSS | — |
| 2 | SSS | — |
| 47 | MGP | — |
| 109.1 | RFJ | — |
| 29.1 | MGP | — |
| 0 | AMH | 12:20 PM |
| 102.9 | MGP | — |
| 109.3 | MSA | DEBRIS/GREASE |
| 17.5 | RFJ | — |
| 109.1 | CM | — |
| 0.1 | MWM | — |
| 32.6 | MGP | — |