Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 30, 2019, 07:39 PM
  • H 0477_H 0476_09302019_130020.mp4

Date
09/30/2019
W/O
787629
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00178
PipeID
P21377
Time
12:39 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6962
Sewer Name
H JOINT OUTFALL H - UNIT 5B
City
LA PUENTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_787629_TV15211_SEP2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
H 0477
Downstream MH
H 0476
Dir. of Survey
Downstream
Length Surveyed
450.6 ft.
Total Length
450.6 ft.
Structural Index
3
Structural Quick
3Q2N
Structural Rating
421
O&M Index
1
O&M Quick
1500
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
426
Pipe schematic from manhole H 0477 to H 0476
MH: H 0477MH: H 0476downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 04770 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT THROUGHOUT10.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"69.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start71.4 ft. VC - Vermin Cockroach72.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"74.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"139.1 ft. LR - Alignment Right, 10 %, Start158 ft. LR - Alignment Right, 10 %, Finish176.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"243.8 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"312.7 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"422.3 ft. SSS - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES446 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish450 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish450.6 ft. AMH - Downstream Manhole, Survey Ends - H 0476450.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (6)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT

    2 ft. - General Observation - MAG COAT THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    69.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Vermin Cockroach

    71.4 ft. - Vermin Cockroach

  • Alignment Right, 10 %, Start

    139.1 ft. - Alignment Right, 10 %, Start

  • Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES

    422.3 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
450.6AMHH 0476
0AMHH 0477
139.1LR
71.4VC
0MWL
2SAP
0MWM
2MGOMAG COAT THROUGHOUT
446SAP
450.6MGOCONNECTION AT MH 3 O'CLOCK
69.1SSS
74.6TFA
176.3TFA
72.8TFC
450SSS
243.8TFA
422.3SSS
158LR
10.9TFA
312.7TFA

Properties (6)

additional_info
SC378574
custom_field_two
3
customer
LACSD
datetime
2019-09-30T12:39:58-07:00
documentation
PRO PIPE
is_lateral_inspection
false