16 0196_16 0195_10032019_001130.mp4

0 ft. - Upstream Manhole, Survey Begins - 16 0196

0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

5 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start
5.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

13.1 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

59.4 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"

109.8 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"

179 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 210 | SAV | — |
| 210 | SSS | — |
| 210.6 | DAGS | — |
| 59.4 | TFA | — |
| 5.4 | DAGS | — |
| 179 | TFA | — |
| 109.8 | TFC | — |
| 0 | MWL | — |
| 5 | SSS | — |
| 13.1 | SAV | — |
| 0 | AMH | 16 0196 |
| 5 | DAE | — |
| 0 | DAGS | — |
| 210.8 | AMH | 16 0195 |
| 210 | DAGS | — |
| 210 | DAE | — |
| 2 | MGO | MAG COAT THROUGHOUT |
| 209.6 | MGO | MAG COAT THROUGHOUT END |