14 0117_14 0116A _09112019_235207.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start
22.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
364.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
385.6 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 0 | MWL | — |
| 381.2 | FM | — |
| 257 | TBA | — |
| 22.1 | CM | — |
| 100.9 | TBA | — |
| 9.9 | TBA | — |
| 371.8 | CM | — |
| 408.7 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOCK |
| 385.6 | CM | — |
| 407.7 | CM | — |
| 2 | DAGS | — |
| 364.2 | FM | — |
| 408.7 | AMH | 14 0116A |
| 150.4 | TBA | — |
| 240 | DAE | — |
| 2 | DAE | — |
| 407.7 | DAGS | — |
| 0 | AMH | 14 0117 |
| 363.5 | TBA | — |
| 97 | TBA | — |
| 213 | TBA | — |