Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 13, 2019, 07:11 AM
  • 14 0158_14 1128_09132019_002444.mp4

Date
09/13/2019
W/O
787624
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P26093
Time
12:11 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6896
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_787624_TV14035_SEP2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0158
Downstream MH
14 1128
Dir. of Survey
Downstream
Length Surveyed
302.5 ft.
Total Length
302.5 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
2
O&M Quick
412K
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
424
Pipe schematic from manhole 14 0158 to 14 1128
MH: 14 0158MH: 14 1128downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01580 ft. MWL - Water Level, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start21.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"24.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"69.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"72.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"223.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"268.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"302.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish302.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish302.5 ft. AMH - Downstream Manhole, Survey Ends - 14 1128302.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
2DAGS
302.5SAP
120.8TFC
69.9TFC
0MWM
24.1TFC
0AMH14 0158
2SSS
302.5DAGS
302.5AMH14 1128
2SAP
21.3TFC
172.4TFC
72.8TFC
223.1TFC
302.5SSS
169.3TFC
268.7TFC
0MWL
271.2TFC
124.1TFC

Properties (6)

additional_info
SC378612
custom_field_two
2
customer
LACSD
datetime
2019-09-13T00:11:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false