Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2019, 08:43 AM
  • 32 1222_32 1221_09192019_020626.mp4

Date
09/19/2019
W/O
782705
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P25648
Time
1:43 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6903
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_782705_TV32001_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
32 1222
Downstream MH
32 1221
Dir. of Survey
Downstream
Length Surveyed
504.9 ft.
Total Length
504.9 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
500
O&M Index
2
O&M Quick
412S
O&M Rating
204
Overall Index
2
Overall Quick
Overall Rating
704
Pipe schematic from manhole 32 1222 to 32 1221
MH: 32 1222MH: 32 1221downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 7 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 32 12222 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 75% MAG COATING THROUGHOUT.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start323.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"502.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish502.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish502.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish504 ft. MGO - General Observation - CAPPED CONNECTION @ D/S MH - 3 O'CLOCK504.9 ft. AMH - Downstream Manhole, Survey Ends - 32 1221

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2DAGS
0MWL
504.9AMH32 1221
502.3SSS
502.3SAP
2SAP
323.9TBA
0MWM
2MGO75% MAG COATING THROUGHOUT.
504MGOCAPPED CONNECTION @ D/S MH - 3 O'CLOCK
0MGOACTIVE CONNECTION AT MH 7 O'CLOCK
2SSS
0AMH32 1222
502.3DAGS

Properties (6)

additional_info
SC378619
custom_field_two
2
customer
LACSD
datetime
2019-09-19T01:43:56-07:00
documentation
PRO PIPE
is_lateral_inspection
false