Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2019, 09:27 AM
  • 32 1220_32 1219 _09192019_024518.mp4

Date
09/19/2019
W/O
782705
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19674
Time
2:27 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6903
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_782705_TV32001_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
32 1220
Downstream MH
32 1219
Dir. of Survey
Downstream
Length Surveyed
577.2 ft.
Total Length
577.2 ft.
Structural Index
3
Structural Quick
3V2V
Structural Rating
575
O&M Index
2
O&M Quick
412V
O&M Rating
234
Overall Index
2
Overall Quick
Overall Rating
809
Pipe schematic from manhole 32 1220 to 32 1219
MH: 32 1220MH: 32 1219downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 12200 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start575.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish575.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish575.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish577 ft. MGO - General Observation - UNKNOWN CONNECTION - D/S MH - 3 O'CLOCK577.2 ft. AMH - Downstream Manhole, Survey Ends - 32 1219

Observation photos (4)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2MGOMAG COATING THROUGHOUT
0AMH32 1220
2SAP
575.4DAGS
2DAGS
575.4SAP
575.4SSS
577.2AMH32 1219
0MWM
0MWL
577MGOUNKNOWN CONNECTION - D/S MH - 3 O'CLOCK
2SSS

Properties (7)

additional_info
SC378619
custom_field_two
2
customer
LACSD
datetime
2019-09-19T02:27:36-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26787