Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 10, 2019, 09:10 AM
  • 32 1229_32 1228 _09102019_022538.mp4

Date
09/10/2019
W/O
782705
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19683
Time
2:10 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6890
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_782705_TV32001_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
32 1229
Downstream MH
32 1228
Dir. of Survey
Downstream
Length Surveyed
493.1 ft.
Total Length
493.1 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
490
O&M Index
2
O&M Quick
412S
O&M Rating
200
Overall Index
2
Overall Quick
Overall Rating
690
Pipe schematic from manhole 32 1229 to 32 1228
MH: 32 1229MH: 32 1228downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 12292 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start3.9 ft. MGO - General Observation - MAG COATING THROUGHOUT 60%481.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - UNKNOWN493.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish493.1 ft. AMH - Downstream Manhole, Survey Ends - 32 1228493.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish493.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT 60%

    3.9 ft. - General Observation - MAG COATING THROUGHOUT 60%

Observations (12)

DistanceCodeObservation
493.1SAP
493.1AMH32 1228
481.2TFUNKNOWN
2SSS
3.9MGOMAG COATING THROUGHOUT 60%
2DAGS
0MWL
2.9SAP
493.1SSS
0MWM
0AMH32 1229
493.1DAGS

Properties (7)

additional_info
SC378606
custom_field_two
2
customer
LACSD
datetime
2019-09-10T02:10:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26787