Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 17, 2019, 09:18 AM
  • 32 1223_32 1222 _09172019_023510.mp4

Date
09/17/2019
W/O
782705
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19677
Time
2:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6899
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_782705_TV32001_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
32 1223
Downstream MH
32 1222
Dir. of Survey
Downstream
Length Surveyed
268.4 ft.
Total Length
268.4 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
265
O&M Index
2
O&M Quick
2J00
O&M Rating
106
Overall Index
2
Overall Quick
Overall Rating
371
Pipe schematic from manhole 32 1223 to 32 1222
MH: 32 1223MH: 32 1222downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 12232 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT 75%266.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish266.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish266.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish268.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 8 O'CLOCK268.4 ft. AMH - Downstream Manhole, Survey Ends - 32 1222

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MWM
2SAP
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
266.7SAP
2SSS
0MWL
0AMH32 1223
268.4MGOACTIVE CONNECTION AT MH 8 O'CLOCK
266.7SSS
266.7DAGS
2DAGS
2MGOMAG COATING THROUGHOUT 75%
268.4AMH32 1222

Properties (7)

additional_info
SC378615
custom_field_two
2
customer
LACSD
datetime
2019-09-17T02:18:26-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26787