Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 25, 2019, 07:34 AM
  • 32 1215_32 1214 _09252019_005214.mp4

Date
09/25/2019
W/O
782705
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19669
Time
12:34 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7011
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_782705_TV32001_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
32 1215
Downstream MH
32 1214
Dir. of Survey
Downstream
Length Surveyed
452.5 ft.
Total Length
452.5 ft.
Structural Index
3
Structural Quick
3Q22
Structural Rating
274
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
282
Pipe schematic from manhole 32 1215 to 32 1214
MH: 32 1215MH: 32 1214downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 12152 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COATING THROUGHOUT450.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish450.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish450.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish452.5 ft. AMH - Downstream Manhole, Survey Ends - 32 1214

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 35% MAG COATING THROUGHOUT

    2 ft. - General Observation - 35% MAG COATING THROUGHOUT

Observations (11)

DistanceCodeObservation
2SSS
2SAP
0MWM
450.5DAGS
2DAGS
0MWL
0AMH32 1215
450.5SAP
2MGO35% MAG COATING THROUGHOUT
452.5AMH32 1214
450.5SSS

Properties (7)

additional_info
SC378627
custom_field_two
2
customer
LACSD
datetime
2019-09-25T00:34:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26787