Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 26, 2019, 08:26 AM
  • 32 1208_32 1207 _09262019_014220.mp4

Date
09/26/2019
W/O
782705
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19662
Time
1:26 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7016
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_782705_TV32001_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
32 1208
Downstream MH
32 1207
Dir. of Survey
Downstream
Length Surveyed
477.5 ft.
Total Length
477.5 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
475
O&M Index
2
O&M Quick
2R00
O&M Rating
190
Overall Index
2
Overall Quick
Overall Rating
665
Pipe schematic from manhole 32 1208 to 32 1207
MH: 32 1208MH: 32 1207downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 12082 ft. MGO - General Observation - 75 % MAG COATING THROUGHOUT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start475.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish475.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish475.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish477.5 ft. AMH - Downstream Manhole, Survey Ends - 32 1207

Observation photos (4)

  • General Observation - 75 % MAG COATING THROUGHOUT

    2 ft. - General Observation - 75 % MAG COATING THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWL
0MWM
0AMH32 1208
475.9DAGS
2MGO75 % MAG COATING THROUGHOUT
2SSS
475.9SAP
2SAP
2DAGS
475.9SSS
477.5AMH32 1207

Properties (7)

additional_info
SC378632
custom_field_two
2
customer
LACSD
datetime
2019-09-26T01:26:12-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26872