Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 27, 2019, 08:18 AM
  • 32 1206_32 1205 _09302019_013444.mp4

Date
09/27/2019
W/O
782705
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19660
Time
1:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7020
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782705_TV32001_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
32 1206
Downstream MH
32 1205
Dir. of Survey
Downstream
Length Surveyed
485.4 ft.
Total Length
485.4 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
480
O&M Index
2
O&M Quick
412R
O&M Rating
196
Overall Index
2
Overall Quick
Overall Rating
676
Pipe schematic from manhole 32 1206 to 32 1205
MH: 32 1206MH: 32 1205downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 12060 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COATING 80% THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start483.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish483.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish483.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish485.4 ft. AMH - Downstream Manhole, Survey Ends - 32 1205485.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2MGOMAG COATING 80% THROUGHOUT
2SAP
485.4AMH32 1205
2SSS
0AMH32 1206
483.1SSS
0MWM
0MWL
483.1DAGS
483.1SAP
2DAGS
485.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK

Properties (7)

additional_info
SC378637
custom_field_two
2
customer
LACSD
datetime
2019-09-27T01:18:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26872