Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 15, 2019, 07:01 AM
  • H 1383_H 1382 _08152019_001641.mp4

Date
08/15/2019
W/O
782286
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01204
PipeID
P16256
Time
12:01 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6805
Sewer Name
H JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_782286_TV22174_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 1383
Downstream MH
H 1382
Dir. of Survey
Downstream
Length Surveyed
234.9 ft.
Total Length
234.9 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
230
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
231
Pipe schematic from manhole H 1383 to H 1382
MH: H 1383MH: H 1382downstream0 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - H 13830 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2.1 ft. MGO - General Observation - 70% MAG COAT THROUGHOUT2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 8"51.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 8"75.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"100.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 8"124.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"172.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"196.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8" - OPEN220.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8" - OPEN232 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - ROACHES @ MH232.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish232.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish233 ft. MGO - General Observation - PEELING AND FLAKING THROUGHOUT REACH234.9 ft. AMH - Downstream Manhole, Survey Ends - H 1382

Observation photos (3)

  • General Observation -  70% MAG COAT THROUGHOUT

    2.1 ft. - General Observation - 70% MAG COAT THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
75.8TFC
100.2TFA
220.1TFOPEN
232.1SAP
124.1TFC
172.4TFC
51.5TFC
2.1MGO70% MAG COAT THROUGHOUT
234.9AMHH 1382
232.1SSS
27.6TF
2.1SSS
232VCROACHES @ MH
0MGOCONN 9 O'CLOCK @ MH/ACTIVE
0AMHH 1383
2.1SAP
196.1TFOPEN
0MWL
233MGOPEELING AND FLAKING THROUGHOUT REACH
0MWM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-15T00:01:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false