Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 23, 2019, 05:32 AM
  • 05 0784_05 0783 _08222019_225024.mp4

Date
08/22/2019
W/O
782229
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00553
PipeID
P06012
Time
10:32 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6811
Sewer Name
05 MANCHESTER-VERMONT DIVERSION EXTENSION TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_782229_TV05202_AUG2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0784
Downstream MH
05 0783
Dir. of Survey
Downstream
Length Surveyed
306 ft.
Total Length
306 ft.
Structural Index
4
Structural Quick
4200
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
8
Pipe schematic from manhole 05 0784 to 05 0783
MH: 05 0784MH: 05 0783downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 07847 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES10.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start301.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish306 ft. AMH - Downstream Manhole, Survey Ends - 05 0783

Observation photos (2)

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    7 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWL
10.9FM
7FM
306AMH05 0783
0MWM
301.2FM
0AMH05 0784

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-08-22T22:32:56-07:00
documentation
PRO PIPE
is_lateral_inspection
false