22 0967_22 0966_08072019_025621.mp4
0 ft. - General Observation - CONNECTION AT MH 9 O'CLOCK
2 ft. - General Observation - MAG COAT THROUGHOUT
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

14 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
57.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
154.7 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
215.9 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"
268.4 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
321.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
366.4 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"
379.5 ft. - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED
| Distance | Code | Observation |
|---|---|---|
| 379.5 | MGO | CONNECTION AT MH 3 O'CLOCK CAPPED |
| 57.6 | TFC | — |
| 2 | MGO | MAG COAT THROUGHOUT |
| 2 | SAV | — |
| 321.6 | TFC | — |
| 379 | SSS | — |
| 154.7 | TFC | — |
| 0 | MWM | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 0 | AMH | 22 0967 |
| 0 | MWL | — |
| 366.4 | TFC | — |
| 376.9 | SAV | — |
| 379 | DAGS | — |
| 215.9 | TF | — |
| 268.4 | TFC | — |
| 3 | DAGS | — |
| 14 | SSS | — |
| 379.5 | AMH | 22 0966 |