22 0964_22 0963_08082019_014229.mp4

0 ft. - Downstream Manhole, Survey Begins - 22 0963
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

2 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - General Observation - MAG COAT THROUGHOUT

7 ft. - Vermin Cockroach, within 8 inches of joint: YES - COCKROACHES IN LINE
9.3 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"

10 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
56.5 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 8"
59.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
69.9 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
102.9 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
111.8 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
159.3 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
191.6 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"
216.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
261 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"
268.3 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"
356.6 ft. - General Observation - CONNECTION AT MH 3 O'CLOCK
| Distance | Code | Observation |
|---|---|---|
| 216.1 | TFC | — |
| 7 | VC | COCKROACHES IN LINE |
| 356.7 | AMH | 22 0964 |
| 2 | SAV | — |
| 365 | SSS | — |
| 2 | SRI | — |
| 0 | MWL | — |
| 356 | SRI | — |
| 2 | MGO | MAG COAT THROUGHOUT |
| 9.3 | TF | — |
| 10 | SSS | — |
| 356.6 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 191.6 | TF | — |
| 0 | AMH | 22 0963 |
| 268.3 | TF | — |
| 69.9 | TFC | — |
| 0 | MWM | — |
| 56.5 | TB | — |
| 159.3 | TFC | — |
| 261 | TFC | — |
| 59.6 | TFC | — |
| 102.9 | TFC | — |
| 111.8 | TFC | — |
| 353.6 | SAV | — |