Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 8, 2019, 09:12 AM
  • 22 0959_22 0958_08082019_024657.mp4

Date
08/08/2019
W/O
782130
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00790
PipeID
P17329
Time
2:12 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5955
Sewer Name
22 BASE LINE TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_782130_TV22002_AUG2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0959
Downstream MH
22 0958
Dir. of Survey
Downstream
Length Surveyed
442.8 ft.
Total Length
442.8 ft.
Structural Index
2
Structural Quick
3Q2O
Structural Rating
509
O&M Index
2
O&M Quick
2Q11
O&M Rating
177
Overall Index
2
Overall Quick
Overall Rating
686
Pipe schematic from manhole 22 0959 to 22 0958
MH: 22 0959MH: 22 0958downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 09590 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start25.1 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - COCKROACHES IN ILINE25.1 ft. SRI - Surface Roughness Increased, from 07 to 05 o'clock, within 8 inches of joint: YES, Start27.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"36 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"42 ft. MGO - General Observation - MAG COAT THROUGHOUT80.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"181.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"186.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"230.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"234.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"275.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"327.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"348.8 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"385.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"389.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"429.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"434.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"440.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish442 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish442 ft. SRI - Surface Roughness Increased, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish442 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish442.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0958

Observation photos (24)

  • Upstream Manhole, Survey Begins - 22 0959

    0 ft. - Upstream Manhole, Survey Begins - 22 0959

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT

    2 ft. - General Observation - MAG COAT THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Vermin Cockroach, within 8 inches of joint: YES - COCKROACHES IN ILINE

    25.1 ft. - Vermin Cockroach, within 8 inches of joint: YES - COCKROACHES IN ILINE

  • Surface Roughness Increased, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    25.1 ft. - Surface Roughness Increased, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    27.9 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    36 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    36.3 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • General Observation - MAG COAT THROUGHOUT

    42 ft. - General Observation - MAG COAT THROUGHOUT

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    80.9 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    129.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    181.9 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    186.2 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    230.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    234.5 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    271.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"

    275.4 ft. - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    327.8 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"

    348.8 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"

    385.4 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"

    389.1 ft. - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"

    429.7 ft. - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"

    434.6 ft. - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"

Observations (31)

DistanceCodeObservation
275.4TFC
0AMH22 0959
429.7TFC
385.4TB
186.2TFC
36SSS
42MGOMAG COAT THROUGHOUT
434.6TFC
442DAGS
0MWM
327.8TFC
389.1TFC
442SRI
181.9TFC
442.8AMH22 0958
129.5TFC
80.9TF
36.3TFC
271.5TFC
2SAV
234.5TFC
230.6TFC
0MWL
25.1VCCOCKROACHES IN ILINE
440.6SAV
25.1SRI
27.9TF
2MGOMAG COAT THROUGHOUT
348.8TB
2DAGS
442SSS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-08T02:12:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false