Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 8, 2019, 07:40 AM
  • H 0726_H 0725 _08082019_004642.mp4

Date
08/08/2019
W/O
776981
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00941
PipeID
P11135
Time
12:40 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6855
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
BASSET
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_776981_TV22077_JUL2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
28 in.
Width
28 in.
Upstream MH
H 0725
Downstream MH
H 0726
Dir. of Survey
Upstream
Length Surveyed
51 ft.
Total Length
51 ft.
Structural Index
3
Structural Quick
3900
Structural Rating
27
O&M Index
2
O&M Quick
412C
O&M Rating
40
Overall Index
2
Overall Quick
Overall Rating
67
Pipe schematic from manhole H 0725 to H 0726
MH: H 0725MH: H 0726upstream0 ft. MSA - Survey Abandoned - REVERSAL COMPLETE. REMAINDER COMPLETED FROM U/S MH.0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1 ft. LR - Alignment Right, 20 %, Finish17.5 ft. MGO - General Observation - MAG COATING THROUGHOUT 40%42.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start43 ft. LR - Alignment Right, 20 %, Start49 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start51 ft. MWM - Water Mark, 50 %of cross sectional area51 ft. MWL - Water Level, 35 %of cross sectional area51 ft. AMH - Downstream Manhole, Survey Begins - H 0725

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWM
50LR
51MSAREVERSAL COMPLETE. REMAINDER COMPLETED FROM U/S MH.
8.3SAP
33.5MGOMAG COATING THROUGHOUT 40%
0MWL
0AMHH 0725
51SAP
2DAGS
51DAGS
8LR

Properties (6)

additional_info
SC378324
custom_field_two
2
customer
LACSD
datetime
2019-08-08T00:40:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false