Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 15, 2019, 03:48 PM
  • H 0718A_H 0718_15082019_090719.mp4

Date
08/15/2019
W/O
766981
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00941
PipeID
P11128
Time
8:48 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6781
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
LA PUENTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_776981_TV22077_JUL2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0718A
Downstream MH
H 0718
Dir. of Survey
Downstream
Length Surveyed
400.4 ft.
Total Length
400.4 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
395
O&M Index
2
O&M Quick
4B2P
O&M Rating
225
Overall Index
2
Overall Quick
Overall Rating
620
Pipe schematic from manhole H 0718A to H 0718
MH: H 0718AMH: H 0718downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 0718A0 ft. MWL - Water Level, 30 %of cross sectional area1.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1.9 ft. MGO - General Observation - 80% MAGNEZIUM H.O COATING THROUGHOUT1.9 ft. VC - Vermin Cockroach1.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start60 ft. LR - Alignment Right, 15 %, Start85 ft. LR - Alignment Right, 15 %, Finish316 ft. LL - Alignment Left, 25 %, Start388 ft. LL - Alignment Left, 25 %, Finish398.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish398.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish398.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish400.4 ft. AMH - Downstream Manhole, Survey Ends - H 0718

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 80% MAGNEZIUM H.O COATING THROUGHOUT

    1.9 ft. - General Observation - 80% MAGNEZIUM H.O COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    1.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
1.9SAP
1.9SSS
398.7SSS
388LL
1.9MGO80% MAGNEZIUM H.O COATING THROUGHOUT
0MWM
398.7SAP
400.4AMHH 0718
0AMHH 0718A
0MWL
398.7DAGS
1.9VC
316LL
1.9DAGS
85LR
60LR

Properties (6)

additional_info
SC378287
custom_field_two
3
customer
LACSD
datetime
2019-08-15T08:48:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false